National Biocontainment Unit
The cladding system we fitted to this unique and highly specced building for the Ministry of Primary Industries also came with a rigorous quality assurance assessment. The original steel frames had been poorly installed, so our work required careful set up, execution and ongoing management to ensure the finished weatherboards were properly installed to a highly flat and true finish.
The complicated system featured Nuwall aluminium weatherboards over cavity batten, over self-adhesive building wrap, over fibre cement rigid air barrier, over XPS thermal break, and finally over new steel frames.
Our Partners
Merrick & Company — Engineering & Architectural Design
Dunning Thornton Consultants, CCM Architects and Beca — Design Support
Fletcher Construction — Construction
Nuwall - Aluminium Cladding
Maxclad - Wrapshield Building Wrap
Insulation Wholesalers - XPS Thermal Break
View case study video.
Watch our video below to learn more about the project, its unique challenges and how our capable team worked proficiently and creatively to problem-solve along the way. We’re chuffed with this one, and you’ll see why!